2005-2006
Extension of the original plant for workshop furniture production with dispatch and paint shop and commissioning of a continuous painting line. Reconstruction and partial extension of the production premises of the old forge shop (prefabricated halls). The photo shows a production of that time - now joiner’s workshop.